Commonly required documents include:

  • Site Plans
  • Architectural drawings
  • Compliance reports
  • Certificate of title
  • Third-party consultants –
    • Stormwater design
    • Structural design
    • Energy Efficiency / Basix Certificate
    • BAL Certificate (Bush Fire Attack Level)
  • Building specifications Additional documents may be needed depending on the project and certifying authority requirements.